A Benson company - serving San Francisco, CA
A new modern detached ADU in a backyard
ADU Builders · Foster City, CA

ADU Builders in Foster City - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

21+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in San Francisco
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A single-story rear room addition with tall windows and a new patio
A new sunroom addition with three walls of windows
A second-story addition that matches the existing roofline
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Foster City

Adding an ADU in Foster City means navigating a tangle of flood elevation rules, HOA design reviews, and aging 1960s-era floor plans, and most homeowners find out the hard way that a generic Bay Area builder doesn’t know the first thing about lagoon-side lots. We do. Benson ADU San Francisco builds detached and attached ADUs across Foster City, and we’re the team that shows up knowing the difference between a V Zone and an AE Zone before the first site visit. Call (424) 328-5746 for a free estimate and a written price before you commit to anything.

Call (424) 328-5746

Why Benson ADU San Francisco Is Foster City’s Preferred ADU Builders Company

A new two-story ADU over a garage

Foster City homeowners call us because we’ve already solved the problems they’re about to run into. Our ADU Builders team has framed units on Compass Lane, in the Islands neighborhood, and up against the levee trails, so we know which lots trigger the elevation certificate requirement and which ones sail through plan review. That local experience means fewer surprise change orders when the city issues corrections on your permit set.

Every Foster City project gets a written price before we start, a 365-Day Done Right Promise in writing, and background-checked, uniformed technicians on site. You won’t chase a project manager for updates. You won’t wonder who’s walking through your gate. And when you call, a live person answers, 24/7, no voicemail tree.

We’re part of the Relay Home Co. family, founded in 2006, and led by Troy Eastman. Our Foster City crews work under The Relay Visibility Guarantee: a written price before any work starts, real-time tracking on your project, and a written guarantee on every build. If a covered item fails within a year, we make it right, free second visit included.

Backyard ADU in Foster City

A Backyard ADU in Foster City is a detached accessory dwelling unit built in the rear yard of a single-family lot, and on this city’s lagoon-side parcels that simple description hides serious grading and foundation work. The first question we ask on any Foster City site visit is whether the lot falls inside the 100-year flood plain, because that answer moves the budget by thousands before a single wall goes up. On flat interior lots along Shell Boulevard or near Edgewater Park, a 500-square-foot backyard ADU typically runs $180,000 to $260,000. On lagoon-side lots in the Islands or along Coronado Lane, that same unit runs $210,000 to $320,000 once you account for raised stem-wall foundations, flood vents, and the elevation certificate the city requires.

Flood Elevation and Foundation Work

Foster City’s levee system keeps most neighborhoods dry, but FEMA maps still classify large sections of the city’s lagoon frontage as special flood hazard areas. A detached Backyard ADU on those lots needs a finished floor at least one foot above the base flood elevation, which usually means a raised stem-wall foundation, engineered fill, and a certificate signed by a licensed surveyor. That’s $15,000 to $30,000 in added cost compared to a standard slab-on-grade build on a dryer Foster City street.

Prefab Backyard Units on Lagoon Lots

We’re authorized to install prefab Backyard ADUs from Abodu and Plant Prefab, and on lagoon-side Foster City lots those factory-built modules still need site-specific foundation engineering. The modules themselves arrive fast, but the elevated foundation, flood vents, and anchoring system have to be designed by a local structural engineer and approved by the Foster City building department. We handle that coordination so the prefab route stays simpler than site-built, even with the added flood requirements.

ADU Construction in Foster City

A compact kitchen inside a new ADU

ADU Construction in Foster City means building a permitted, inspector-approved accessory dwelling unit on your existing lot, either attached to the main house or standing alone in the yard, and this city’s mix of 1960s ranch homes and newer planned subdivisions creates two very different builds. Most Foster City homes are wood-frame on concrete slab foundations, with uniform lot dimensions that make detached ADUs relatively predictable. But the differences show up fast: a home in the Winston Square area built in 1972 needs seismic strapping upgrades before we tie in a new attached ADU, while a home in the Edgewater Isle planned development triggers HOA architectural review before the city even looks at your plans.

Site-Built Detached Units

A custom site-built ADU in Foster City gives you full control over layout, finish level, and roofline matching, which matters when an HOA’s design guidelines restrict your exterior options. Expect $220,000 to $340,000 for a 600-to-800-square-foot one-bedroom with a full kitchen and bath, depending on foundation conditions and wind-resistant detailing. Foster City’s bay-front exposure means we upgrade Simpson hurricane ties, wall-to-foundation straps, and nailing patterns far beyond what a standard California build requires.

Attached ADUs and JADUs

Attached ADUs and Junior ADUs convert existing square footage or extend from the home, and on a 1970s Foster City home the structural retrofit work often equals the cost of the new space itself. A 400-square-foot JADU inside an existing garage runs $90,000 to $150,000, while a 500-square-foot attached ADU addition runs $190,000 to $270,000 before any flood or wind upgrades. The city’s zoning code has historically favored detached units, and while state law now forces approval of attached ADUs, the plan review path still generates more corrections than a detached build.

Trusted Brands We Service in Foster City

We build with brands Foster City homeowners can research independently: Abodu and Plant Prefab for factory-built ADU shells, Tuff Shed for permitted backyard structures, and James Hardie fiber-cement siding for the wind-rated exterior cladding this city’s bay exposure demands. When you choose a prefab route, we handle the local foundation engineering, flood elevation, and HOA submittal, so the factory product arrives ready to be set on a foundation that actually meets Foster City’s requirements. We don’t stock parts on a shelf; we order brand-specific components per project to match the approved plans exactly.

Common ADU Builders Problems We See in Foster City Homes

  • Lagoon-side lots priced like flat, dry parcels. A builder who’s never pulled a Foster City elevation certificate will quote you a standard slab foundation and then hit you with a $20,000 change order when the city flags the flood zone. We flag it on day one and write it into the first price.
  • Wind detailing that fails Foster City inspection. Foster City’s bay-front exposure triggers upgraded Simpson ties, strapping, and nailing schedules under the coastal wind exposure category. Inland builders routinely miss this, and the correction means tearing open walls that already passed rough framing in your mind.
  • HOA architectural review ignored until after permits are pulled. Newer Foster City subdivisions like Edgewater Isle and portions of the Islands have paint-color, roofline, and even siding-material restrictions. We route plans through HOA review before the permit submittal so a redesign doesn’t land after you’ve paid for engineering.
  • Builder warranties on newer homes voided by careless additions. Some Foster City homes are newer than the city’s 1960s origins, and adding an ADU while the original builder warranty is still active requires specific framing techniques and tie-in details to avoid voiding coverage. We’ve navigated those warranty terms, and we’ll tell you what can be touched and what can’t before the saws start.

Pricing for ADU Builders in Foster City, CA

ADU construction in Foster City runs $90,000 to $150,000 for a JADU conversion, $180,000 to $320,000 for a detached one-bedroom backyard unit, and $220,000 to $340,000 for a custom site-built ADU, with lagoon-side flood elevation adding $15,000 to $30,000 and coastal wind detailing adding another $8,000 to $15,000 depending on exposure. Those are our real-world ranges for this city’s market, not San Mateo County averages. Your exact price comes down to lot location, foundation type, finish level, and whether the HOA demands specific exterior treatments. Every Foster City estimate is a written price, not a verbal ballpark, and it stays fixed unless you change the scope. Call (424) 328-5746 and we’ll walk your lot, run the flood zone, and hand you a line-item quote you can take to the bank.

We Also Serve Cities Near Foster City

Our ADU crews work throughout San Francisco, Berkeley, Vallejo, and Piedmont, and the same written-price guarantee and 365-Day Done Right Promise apply on every project. If you’re just outside Foster City and wondering whether we cover your street, call (424) 328-5746 and we’ll tell you straight. Chances are we’ve already framed a unit within a mile of your lot.

Serving Foster City, CA - Our Local Coverage Area

We’re based in the Foster City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Foster City

Why Foster City Chooses Benson ADU San Francisco

We set the standard for adu builders in Foster City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Foster City

Getting your adu builders handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu builders needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Foster City - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Foster City Customers Say

Trusted by homeowners across Foster City and surrounding areas.

★★★★★

"Solid job. Cabinets arrived late but they adjusted the schedule."

Eli K. · Verified customer
★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B. · Verified customer
★★★★★

"Communication was the best part. I always knew what was happening that week without having to ask."

Dolly N. · Verified customer

More ADU services in Foster City

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in San Francisco

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your San Francisco team

A local crew that works across San Francisco and the towns around it, to the same written standard as every Benson location.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Builders in Foster City?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Foster City.

(424) 328-5746

Request a Free Estimate in Foster City

Tell us about your adu builders needs - we'll respond within the hour.

By clicking submit, you confirm you have read our Privacy Policy and agree that you may be contacted through phone, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch